Oakfield Park

  • Country UK, Berkshire
  • Build year 1987
  • Area 2229 m²
  • LOXONE partner WIISE LIMITED
Oakfield Park

Challenge

The challenge for us was the removal of an extremely old Lutron & Crestron system which was no longer performing. The property is across 75 acres and includes multiple buildings, the client wanted everything automated that could be easily controlled through one platform.

Solution

We installed multiple Loxone Miniservers deployed across a fibre network creating lots of smaller Loxone installations. That can all be controlled through the one Loxone App. The install included automated features for lighting, shading, heating, cooling, ventilation, access, energy management and the pool.

We used Loxone as the main product partner because of the scalability, capability and reliability of the Loxone products.

Dan Milne, Director

To overview