Challenge
The intervention concerned the first phase of a comprehensive energy optimization project, focused on the boiler room and gas distribution system of the site. The objective was to modernize the thermal management of a facility comprising three boiler rooms and four substations, requiring precise coordination of the hydraulic circuits. Therefore, the first phase of the project was structured around:
- The installation of three-way hydraulic valves to ensure precise regulation of flow rates and temperatures.
- The instrumentation of the circuits with surface-mounted probes positioned on the supply and return lines of the primary circuit, as well as on each secondary circuit, to enable tailored regulation.
- The intervention was carried out in several stages, ensuring the continuity of site operations and the safety of existing installations.
The main challenge was to deploy a high-performance control infrastructure across a multi-site boiler room, while simultaneously preparing the groundwork for subsequent phases of energy optimization.
- The installation of three-way hydraulic valves to ensure precise regulation of flow rates and temperatures.
- The instrumentation of the circuits with surface-mounted probes positioned on the supply and return lines of the primary circuit, as well as on each secondary circuit, to enable tailored regulation.
- The intervention was carried out in several stages, ensuring the continuity of site operations and the safety of existing installations.
The main challenge was to deploy a high-performance control infrastructure across a multi-site boiler room, while simultaneously preparing the groundwork for subsequent phases of energy optimization.
Solution
We implemented a hydraulic regulation and thermal control infrastructure tailored to the site's specific characteristics:
- Installation of 3-way hydraulic valves enabling precise flow modulation and stable regulation of the heating circuits.
- Deployment of surface-mounted sensors on the supply and return lines of the primary circuit, providing reliable measurement of temperature variations and a calculation basis for regulation.
- Equipping each secondary circuit with dedicated sensors to ensure individualized and optimized temperature control by zone.
- Preparation of the technical architecture for future integration of the building management system (BMS) and advanced energy monitoring functionalities.
- Installation of 3-way hydraulic valves enabling precise flow modulation and stable regulation of the heating circuits.
- Deployment of surface-mounted sensors on the supply and return lines of the primary circuit, providing reliable measurement of temperature variations and a calculation basis for regulation.
- Equipping each secondary circuit with dedicated sensors to ensure individualized and optimized temperature control by zone.
- Preparation of the technical architecture for future integration of the building management system (BMS) and advanced energy monitoring functionalities.
This first phase of boiler room modernization has enabled the site's thermal management to be structured through optimized hydraulic regulation. The installation of three-way valves and surface-mounted sensors now provides reliable temperature measurement and more precise control of the heating circuits. This technical foundation forms a solid base for future phases of the project and for the continuous improvement of the facility's energy performance.