New villa
- Country CH, Kanton Zürich
- Build year 2019
- Area 515 m²
- LOXONE partner Honegger Elektro Telecom AG

Challenge
We plan and implement everything from a single source. This gives us the opportunity to identify customer needs at the first project meeting long before construction begins.
It quickly became apparent that a cross-system solution would need to be built due to the volume and complexity.
It quickly became apparent that a cross-system solution would need to be built due to the volume and complexity.
Solution
During the planning phase, we had the opportunity to wire the 112 RGBW spots in such a way that the cables were not too long, not overloaded, but also sensibly constructed. A total of 7 10 amp power supplies are in use for the sensors, spots, LED strips and the actuators. These power supplies are all easily accessible in the technical room. This means that heat management is optimally solved.
We have many different lighting circuits per room, which is why Loxone worked with the innovative operating concept from the start. Later, the Miniserver Gen. 1 was replaced by the new Miniserver so that there are no limits to the app.
Simon Honegger, Project Manager