Manresa practical training center

  • Country ES, Manresa, Barcelona
  • Build year 2013
  • Area 502m2 m²
Manresa practical training center

Challenge

In a space with these characteristics, it is difficult to control the temperature efficiently, since with such large rooms and high ceilings, consumption is usually very high. In addition, in matters of comfort, it must be controlled that the hot air reaches the lower parts correctly and that the uniformity of the temperature is maintained as much as possible.



The main objective is to improve the consumption and comfort of the people who work and study at the CFP and for this the plant is automated with the Loxone Minserver.

Solution

Schedules for more efficient consumption and increased comfort, "everything off" option, security system with alarms, temperature log and remote control.

To overview