Charging stations

  • Country FR, Valence
  • Build year 2026
  • Area 200 m²
  • LOXONE partner SNER Rhône Alpes
Charging stations

Challenge

A design office asked us to equip a company with 10 electric charging stations with dynamic control based on the number of vehicles charging. These stations are activated via badges.

Solution

Ten 22kW Wallboxes and ten NFC touch-sensitive codes were installed to create parking spaces. For automation, a compact mini-server and a 1&5A Meter with a current transformer will be used.

The Loxone solution was used for its ease of programming compared to the various solutions available on the market.

GARRIGOS, Technician

Products

  • Miniserver Compact · 100512
  • Energy Meter for 1&5A Current Transformers Tree · 100652
  • 5A Current Transformers 400A 35mm (3 pcs.) · 100678
  • Encrypted NFC Smart Cards White Set - 10 pieces · 200447
  • Wallbox 22kW 32A Tree · 100677
  • Tree Cable (200m) · 100637
  • Power Supply 4.2A · 100617

To overview