For a better experience, we recommend the United States website, which has content more relevant to your location.

Close Banner
🇺🇸 United States Chevron Down
  • 🇺🇸 United States
  • Choose country or region
Close Banner
ES
{{filters.projectType['Array']}}
Volver

Guardia Urbana Ciutat Vella

                                    array(23) {
  ["id"]=>
  int(7945)
  ["name"]=>
  string(27) "Guardia Urbana Ciutat Vella"
  ["slug"]=>
  string(27) "guardia-urbana-ciutat-vella"
  ["challenge"]=>
  string(741) "El principal objetivo de este proyecto consiste en controlar el clima de los diferentes espacios: despachos, zonas comunes, zonas de reunión, salas de conferencias, etc.

Al ser un edificio donde también tenemos vestidores para el cuerpo de policía, requería el control del ACS.

Un aspecto también muy importante es el control la ventilación del edificio y garantizar unos niveles correctos de CO2 y humedad.

Como muchos edificios públicos, hoy en día se requiere tener el control de los consumos energéticos de las máquinas de producción de clima, ACS y del sistema de renovación de aire.

Otro objetivo era el control y el registro de incidencias y alarmas técnicas. " ["solution"]=> string(946) "La solución para controlar cada espacio de la instalación pasó por la instalación del Touch Flex para poder tener el control sobre la temperatura y las velocidades de los fancoils de cada espacio.

En este caso controlamos una maquina encargada de la producción del clima, otra máquina para la producción del ACS y hasta 5 recuperadores de aire para todo el sistema de renovación del aire del edificio. El control de todas estas máquinas se hace mediante una integración por modbus RTU.
Para poder tener los consumos de la producción de clima, ACS y de las máquinas de renovación de aire, se hizo mediante analizadores de red de cada una de estas.

En un edificio como este, también es muy importante la gestión de las alarmas técnicas, de esta manera, se puede informar a los equipos de mantenimiento de cualquier error o anomalía detectada en los sistema integrados y controlados.
" ["partner_quote"]=> string(0) "" ["partner_quote_name"]=> string(0) "" ["partner_quote_position"]=> string(0) "" ["more_info_url"]=> string(0) "" ["preview_image"]=> string(81) "https://portal.loxone.com/admin/wp-content/uploads/2023/08/1692263840-768x512.jpg" ["application_areas"]=> array(4) { [0]=> string(7) "cooling" [1]=> string(7) "heating" [2]=> string(11) "ventilation" [3]=> string(6) "energy" } ["tags"]=> array(0) { } ["project_type"]=> array(1) { [0]=> string(6) "office" } ["copyright"]=> NULL ["images"]=> array(4) { [0]=> array(2) { ["image"]=> string(82) "https://portal.loxone.com/admin/wp-content/uploads/2023/08/1692263840-1024x683.jpg" ["copyright"]=> string(0) "" } [1]=> array(2) { ["image"]=> string(73) "https://portal.loxone.com/admin/wp-content/uploads/2023/08/1692263853.jpg" ["copyright"]=> string(0) "" } [2]=> array(2) { ["image"]=> string(82) "https://portal.loxone.com/admin/wp-content/uploads/2023/08/1692264187-1024x768.jpg" ["copyright"]=> string(0) "" } [3]=> array(2) { ["image"]=> string(82) "https://portal.loxone.com/admin/wp-content/uploads/2023/08/1692264280-1024x541.jpg" ["copyright"]=> string(0) "" } } ["country"]=> string(2) "ES" ["city"]=> string(30) "Barri Ciutat Vella - Barcelona" ["build_year"]=> string(0) "" ["square_meters"]=> string(0) "" ["account_data"]=> array(4) { ["id"]=> string(36) "c5a6a44c-d093-4977-8b53-b76e1f60653d" ["name"]=> string(28) "9 HABITAT INTEL LIGENT, S.L." ["website"]=> string(21) "https://9habitat.com/" ["partner_website"]=> string(51) "/partner/08540-centelles/9-habitat-intel-ligent-sl/" } ["conference"]=> string(4) "none" ["fallback"]=> array(8) { ["name"]=> string(26) "City Guard in Ciutat Vella" ["challenge"]=> string(726) "The main objective of this project was to control the indoor climate of different areas (offices, common areas, meeting areas, conference rooms, etc).

As the building also has locker rooms for the police force, it required an access control system.

Another very important aspect was the control of ventilation throughout the building and ensuring the correct CO2 and humidity levels.

Like many public buildings today, the project required implementing the intelligent control and energy consumption management of the air conditioning units, the hot water servicing and the air renewal ventilation system.

Another objective was to record incidents and control alarms." ["solution"]=> string(815) "The solution to control each area individually was the installation of Touch Flex switches that are set to operate the temperature and the speed of the fan coils in each space.

In this case, Loxone controls a unit in charge of all indoor climate features, a different machine hot water servicing and up to 5 air recuperators for the entire air renewal ventilation system in the building. The control of all these machines is done through an integration with the Modbus RTU.
In order to monitor the energy consumption of all the above, network analysers for each of these units were implemented.

In a building like this, the management of alarms is also very important. These inform the maintenance teams of any error or anomaly detected in the integrated and controlled systems." ["partner_quote"]=> string(0) "" ["partner_quote_name"]=> string(0) "" ["partner_quote_position"]=> string(0) "" ["more_info_url"]=> string(0) "" ["video"]=> string(0) "" } ["video"]=> string(0) "" }

Datos de interés

País
{{getRegion('ES')}}
Ubicación
Barri Ciutat Vella - Barcelona
Partner de Loxone

Objetivo del proyecto

El principal objetivo de este proyecto consiste en controlar el clima de los diferentes espacios: despachos, zonas comunes, zonas de reunión, salas de conferencias, etc.

Al ser un edificio donde también tenemos vestidores para el cuerpo de policía, requería el control del ACS.

Un aspecto también muy importante es el control la ventilación del edificio y garantizar unos niveles correctos de CO2 y humedad.

Como muchos edificios públicos, hoy en día se requiere tener el control de los consumos energéticos de las máquinas de producción de clima, ACS y del sistema de renovación de aire.

Otro objetivo era el control y el registro de incidencias y alarmas técnicas.

Solución

La solución para controlar cada espacio de la instalación pasó por la instalación del Touch Flex para poder tener el control sobre la temperatura y las velocidades de los fancoils de cada espacio.

En este caso controlamos una maquina encargada de la producción del clima, otra máquina para la producción del ACS y hasta 5 recuperadores de aire para todo el sistema de renovación del aire del edificio. El control de todas estas máquinas se hace mediante una integración por modbus RTU.
Para poder tener los consumos de la producción de clima, ACS y de las máquinas de renovación de aire, se hizo mediante analizadores de red de cada una de estas.

En un edificio como este, también es muy importante la gestión de las alarmas técnicas, de esta manera, se puede informar a los equipos de mantenimiento de cualquier error o anomalía detectada en los sistema integrados y controlados.