Pärnu mnt 495 Ärimaja

  • Country EE, Saue vald, Laagri
  • Build year 2024
  • Area 1200 m²
  • LOXONE partner Elkoral OÜ
Pärnu mnt 495 Ärimaja

Challenge

The following criteria must guide the selection of system components of the building automation system:

- The building automation system must ensure an optimal indoor climate with minimal energy consumption;

- Integration for harmonizing different technical systems of the building and adding functions must

be based on an analysis that takes into account the savings potential to achieve accurate and low energy consumption

with adequate management;

- The selected building automation system must enable expansion, modernization, and communication

using open communication protocols for maintenance, monitoring, and operational control,

that the system can be connected to different structures;

- Automation as a whole must enable operational management, and the implementation of decisions must be fast

feasible;

- At the same time, people's safety must be guaranteed, as well as the protection of equipment and material values.

Solution

Integration of third-party access and security

Climate control

Monitoring and management of technical systems (alarms, states)

Energy monitoring (PV yield and consumption)

Control of outdoor lighting

Remote reading of M-Bus meters and reports monthly

To overview