Own project DOM - Phase 1
Fact Check
Country
{{getRegion('SK')}}
Location
Vlčkovce
Construction year
2022
Area
100 m2
Loxone Partner
Challenge
THIS CONTENT IS AUTOMATICALLY TRANSLATED BY GOOGLE TRANSLATE.Remodeling of the installation mix (flood wiring and wiring controlled by Siemens PLC S-1200) for wiring with LOXONE.
Solution
THIS CONTENT IS AUTOMATICALLY TRANSLATED BY GOOGLE TRANSLATE.Gradual remodeling of the house.
Phase 1: Remodeling of the floor.
Flood installation replaced by LOXONE products with Tree technology.
Electrical installation on Siemens PLC S-1200 replaced by LOXONE products with Air technology
Potential-free buttons (12-24V) brand LIVOLO replaced by LOXONE Touch buttons.
Preparation for shading technique (external blinds)
THIS CONTENT IS AUTOMATICALLY TRANSLATED BY GOOGLE TRANSLATE.
BohušMrva
After the LOXONE training, I definitely decided on electrical installation from LOXONE for my own house/company. It suits me completely in all directions.
Both the Application user environment and the Loxone Config user environment suit me as much as I am a PLC programmer. I am also satisfied with the price/performance ratio of Loxone. After the training, there was nothing to hesitate :) In addition, it is good to show your future customers what LOXONE can do, and there is no better place for this demonstration than at your own home/at your company. :)